A freshly plastered wall usually needs to be patched up after the first coat of wall filler is applied. The process needs to be repeated when the first coat of paint is applied and what you get is, patches on patches
This entry was posted
on Sunday, May 4th, 2008 at 4:51 pm and is filed under Architecture, Colombo.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.
Leave a Reply
Photos uploaded using. Rad Upload. Site powered by Wordpress and the Magellan Theme.